HV maintenance levels 1 to 4 and interventions on 2 hydraulic dams and 3 photovoltaic sites, Valemo

Forme

Challenge of the project

To meet its customer’s needs, Valemo asked MasterGrid to bring the installations up to standard and check the electrical equipment at 2 hydroelectric dams and 3 photovoltaic sites. The aim is to guarantee the safety, compliance and performance of the installations through preventive and corrective action.

Our response

Since the launch of the contract, our teams have been fully committed to carrying out these operations on the various sites.

Check

Efficient coordination between our network of agencies and Valemo's teams, to guarantee effective interventions.

Check

Preventive and corrective maintenance of energy production equipment to extend their service life.

Forme Join